
Complex of residential buildings with service premises on the ground floor and underground garage at Sowińskiego and Człuchowska Streets - stage 1A
In the scope of the stage 1A of housing development Verdis Mostostal Warszawa builtthree residential buildings A, B, C which have from 7 to 8 aboveground storeys. Underground part of buildings D and E is forseen to be done in the next stage of the project. The complex accomodates 128 flats with a large range of surface available, 11 service premises and 184 parking places.Cubic volume of the buildings A, B, C is 43 500 m³.
Mostostal Warszawa was also responsible for the realization of stage 1 B – construction of two seven-storey residential buildings D and E and fitting works in the belonging to it underground garages.
Stage 1A was completed in April 2013, stage 1B in January 2014.
Investor: Ronson Development Millenium Sp. zo.o.
Contractor: Mostostal Warszawa SA
Contract value: PLN 43,6 mln
Implementation period: 2010-2013
Country: Poland
Województwo: masovian










