The Third Millennium John Paul II Bridge across Martwa Wisła River in Gdańsk
Infrastructure

The Third Millennium John Paul II Bridge across Martwa Wisła River in Gdańsk

The scope of work included fabrication and assembly of 2 400 tonnes of bridge steel structure with corrosion protection work. Suspension bridge with one pylon. The height of the pylon is 97 m, lenght of the bridge is 381 m and span lenght is 230 m.

  • Investor: GDDKiA Oddział Gdańsk
  • Contractor: Mostostal Puławy S.A
  • Contract value: PLN 22,4 mln
  • Implementation period: 1999–2001
  • Country: Poland
  • Voivodeship: Pomerania